This project consisted of 2 additions/renovations constructed in phases which overlapped to condense the overall schedule. Phase 1 was the construction of a 5,300 sf MRI Suite (25% renovation/75% addition). Phase 2 was the construction of a 61,000 sf Main Entrance Lobby (20% renovation/80% addition).