Word of Life Bible Institute – The Pines
This three-phase project began with sitework and infrastructure upgrades for four (4) staff cabins, three (3) duplexes, and one (1) triplex and maintenance building. Phase 2 consisted of construction of 14,010 sf student dormitory facilities including five (5) Cabins consisting of three (3) triplex and two (2) duplex buildings. This phase also included construction of a camp store and miscellaneous site work Phase 3 included Construction of 27 RV camp sites, a staff cabin facility, renovation of an existing bath house, and all associated site work.