Onteora Central School District

Onteora Central School District locker room with red lockers
Onteora Central School District locker room with red lockers and checkered tile walls
Onteora Central School District locker rom urinal
Onteora Central School District locker room with red lockers
Onteora Central School District gymnasium entrance
Onteora Central School District locker room showers
Onteora Central School District locker room with red lockers
Onteora Central School District locker room with red lockers
Onteora Central School District locker room with red lockers and checkered tile walls
Onteora Central School District locker rom urinal
Onteora Central School District locker room with red lockers
Onteora Central School District gymnasium entrance
Onteora Central School District locker room showers
Onteora Central School District locker room with red lockers

The Onteora CSD was planning on completing major renovation and asbestos abatement work of their existing locker rooms for both the High School and Middle School along renovating ten bathrooms during the short summer months. BBL was brought on board the team right before the project was about to be placed out for bid in late spring. After extensively reviewing the extent of work in the field, analyzing site logistics and District needs, a plan was quickly identified and presented to the District to complete the work in strategically phased portions. This allowed an opportunity to have the project bid, material procured and work scheduled and completed on time. 

In addition, BBL worked with the District to have the new lockers procured under state contract and ordered in advance of the busy summer months to ensure their timely arrival. The replacement of the Bennett Elementary Roof was also identified as an item that could be completed under state contract pricing, thus saving time in bidding and procuring material so that the work could be finished on time. It is this expertise that BBL brings to each project in helping identify critical paths of work and sound solutions to achieve schedule goals.

The phased construction included renovation of the Boys and Girls High School and Middle School locker rooms; extensive renovations to restrooms throughout the Middle School and High School; roof renovations; extensive asbestos abatement; MEP upgrades; construction of a new ADA ramp; parking lot restoration; ball field restoration and drainage repairs; and extensive sitework.

Delivery Method:

Construction Management

Location:

Boiceville, NY

Square Footage:

9,000

Get In Touch

BBL provides subject matter experts and delivery guarantees for every building project. Contact us today for information about your next project.

This field is for validation purposes and should be left unchanged.

Explore More Projects

BOCES Career and Technical Education (CTE) Extension Center

Location: Colonie, NY

Square Footage: 46,300

View Case Study

KIPP Central High School

Location: Albany, NY

Square Footage: 96,000

View Case Study

The Learning Experience

Location: Halfmoon, NY

Square Footage: 10,000

View Case Study