As a result of Hurricane Irene and Tropical Storm Lee, the Schoharie County Office Building was flooded to a depth of seven-feet above the first floor. BBL was selected to manage the repairs to the building, including the relocation of all critical infrastructure to above flood stage. An additional challenge for the project was the need for the County to partially occupy the building during the reconstruction. Further, the County desired to upgrade systems which were not impacted by the flooding, requiring close accounting to separate this value for FEMA.